← Back to news
Network

L11 arrives, from Trinitat Nova to Can Cuiàs

Five lime-green stops, a single track and the two-car 500 series. You can already play L11 alongside L2 and L3.

Trinitat Nova platform on line L11 of the Barcelona metro simulator MetroSim

The simulator’s third line runs through Trinitat Nova, Casa de l’Aigua, Torre Baró | Vallbona, Ciutat Meridiana and Can Cuiàs. About 2.1 km of single track with short platforms for the two-car train.

When you join you pick L2, L3 or L11. Each line has its own fleet: the 2000 series on L2, the 3000 on L3 and the 500 on L11. The AI keeps the headway when nobody drives.

Latest news

Start playing

Free, in your browser, with the line waiting for you.

Enter the simulator